The Rochester City School District
-
The Rochester City School District
- May 24, 2019
- Posted by: carriefalzone
- Category:
No Comments
PROJECT DETAILS The Panel: Rieder Öko Skin The Framing: Knight Wall HCI grits with Panel Rail and Reveal Girt The Insulation: Hunter XCI CG The Air Barrier: Carlisle Coatings and Waterproofing Barritech NP The Architect: SWBR Rochester, NY THE PROJECT The Rochester City School District demands exterior materials that can withstand the abuse of kids -
Henrietta Recreation Center
- November 4, 2016
- Posted by: Kevin Scott
- Category:
fullsizeoutput_2ebcIMG_3086IMG_2911IMG_2913IMG_2912 PROJECT DETAILS Client: The town of Henrietta Location: Henrietta, NY Wall products: CCW Barritech NP, Hunter Panels XCI Class A, Knight Wall CI- Girt Roofing products: Carlisle Syntec EPDM roof system, Carlisle tapered insulation, Carlisle edge metal Completed: March, 2017 Architect: Passero Associates THE CHALLENGES The new Recreation Center for Henrietta, NY faced the -
Women and Children’s Hospital of Buffalo
- April 11, 2016
- Posted by: carriefalzone
- Category:
IMG_0359IMG_0356IMG_0351IMG_0350IMG_0361IMG_0362IMG_0686IMG_0687IMG_0688IMG_0869IMG_0872IMG_0870IMG_1322IMG_1326IMG_1330IMG_1323IMG_1324IMG_1331IMG_1325 PROJECT DETAILS Client: Women and Childrens' Hospital of Buffalo Location: Buffalo, NY Wall products: Soprema Xpress G, Knight Wall MFI Securement System for metal panels Completed: September, 2017 Architect: Shepley Bulfinch Richardson & Abbott of Boston, MA THE CHALLENGES The Women and Children’s Hospital of Buffalo was a large new construction project that involved -
Upstate Medical Center
- April 11, 2016
- Posted by: carriefalzone
- Category:
IMG_2976IMG_2974IMG_2973IMG_2975IMG_3443IMG_3442 PROJECT DETAILS Client: SUNY Upstate Medical School- New Academic Building Location: Syracuse, NY Waterproofing Products: CCW 860/ 861 Wall Products: CCW Barritech NP Project complited: 2016 / September Architect: Ewing Cole Architects Category: Green Building, Commercial Value: $40.5 million THE CHALLENGES Every building has challenges that can feel unsurmountable but with time and thought -
Cornell University – Klarman Hall
- April 20, 2015
- Posted by: carriefalzone
- Category:
Klarman-HallKlarman-Hall1IMG_3414IMG_3411IMG_3408IMG_3403IMG_3406IMG_3413IMG_0345IMG_0347IMG_0346IMG_0344IMG_0349IMG_0348IMG_0904IMG_0905IMG_0900IMG_1035IMG_1039IMG_1038IMG_1037IMG_1031IMG_1033 Faced with many challenges, this complex project required a superior waterproofing/ drainage system, a broad product line up, compatibility with multiple waterproofing and air barrier products, the ability to quickly create custom products to address unusual details, and a supportive rep firm with experience-based solutions. EXPERIENCE BASED SOLUTIONS CCW Miraply was utilized underneath the basement slab to combat the consistently high water-table that was above the subfloor level. CCW Miraply -
706 North Clinton
- April 20, 2015
- Posted by: carriefalzone
- Category:
IMG_0270IMG_0267 THE CHALLENGES Some projects present never-before-seen challenges that will stop a brainstorming group in their tracks. The architect wanted a terra cotta rain screen cladding on the re-clad of an old warehouse in Syracuse, NY. The area was going through a revitalization and the owner was on board with the look. The terra cotta -
Cornell University – University Health Services
- April 20, 2015
- Posted by: carriefalzone
- Category:
IMG_0204IMG_0203IMG_0215IMG_0213IMG_0217IMG_0220IMG_0891IMG_3627IMG_3626IMG_1650IMG_1649 PROJECT DETAILS Client: Cornell University Location: Ithaca, NY Waterproofing Products: CCW Miraply, CCW 860/ 861 Air Barrier: CCW Baritech NP Exterior Insulation: Hunter Panels XCI Foil, CCW R2+ Silver Surface Area: 50K square feet Completed: September, 2016 Value: $55 million Architect: Chiang O’Brien Architects THE CHALLENGES The new University Health Services building was crowbarred -
Cornell University Veterinary Research Building
- April 20, 2015
- Posted by: carriefalzone
- Category:
THE INSTALLATION This project required an application of the CCW 861 Miradri waterproofing system to be applied during the winter. Cold weather applications always present an unknown set of challenges and this job had a few of them. Aside from the challenges the 861 membrane was installed with the low voc 702 LV primer. The -
Hobart and William Smith College
- March 26, 2015
- Posted by: carriefalzone
- Category:
IMG_2981IMG_2987IMG_2985IMG_2986IMG_2895IMG_2905IMG_2903IMG_2904IMG_2902 GENERAL CONSTRUCTION The Hobart and William Smith Performing Arts Center project had many Carlisle products on it from the waterproofing below grade, extending up to the air barrier on the exterior walls and protected by the Carlisle single ply roofing membrane. THE WATERPROOFING The project started out with a standard below grade waterproofing membrane -
Mercy High School Addition
- March 25, 2015
- Posted by: carriefalzone
- Category:
IMG_0440IMG_0640IMG_0639IMG_0641IMG_0642IMG_0644 PROJECT DETAILS Client: Mercy High School Location: Rochester, NY Air Barrier: CCW Barritech VP Exterior Insulation: Hunter Panels XCI Class A Rain Screen Securement System: Knight Wall HCI Girt Project started: 2015 Project complited: 2016 Architect: SWBR Architects Category: Green Building, Commercial Value: $15 million THE CHALLENGES This project was a very small
Cannan, Alexander & Scott
Address:
1 Grove Street Suite 210
Pittsford, NY 14534
Phone:
585-727-1010 (All Services)
585-703-9737 (Walls)
585-727-1010 (Roofing)
www.casreps.com

